DARKOZA / OERSIفارسی
Illustrative deliverable preview · synthetic scenario

Sample diagnostic: turning an incoming project request into a reviewed proposal brief.

This page shows the structure and decision quality of an OERSI diagnostic. It is a fictional workflow with synthetic inputs, not a customer engagement, benchmark, measured result or case study.

Evidence boundary: All scenario details and numerical inputs below are synthetic and exist only to demonstrate the method. No client savings, revenue increase, time reduction or production deployment is claimed.

1. Scenario and scope

Example team: a small software services team. Workflow: receive an RFP or project enquiry, qualify it, prepare a technical brief and draft a proposal for human review.

2. Current-state process map

StepOwner / actionTypical failure to check
1. IntakeSales coordinator reads the request and copies details into notes.Required fields are missing or duplicated.
2. QualificationProject manager checks fit, deadlines and dependencies.Questions are sent in separate threads; ownership is unclear.
3. Technical reviewTechnical reviewer estimates feasibility and effort.Review waits in an inbox without a visible due date.
4. Proposal draftCoordinator assembles a brief and a proposal from templates.Information is re-entered and versions diverge.
5. Follow-upOwner manually records the next action.Follow-ups are missed or lack context.

These failure modes are hypotheses to validate with the actual process owner, not observed facts about any real company.

3. Example baseline

InputSynthetic exampleHow it is treated
Requests per week12Hypothetical input
Manual preparation per request45 minutesHypothetical input
Calculated monthly preparation time39 hours12 × 45 ÷ 60 × 52 ÷ 12
Cash savingsNot establishedRequires measured time released, realizability and customer cost data

The 39-hour figure is only the arithmetic result of the synthetic assumptions. It is not a promised saving or a claim that 39 hours can be eliminated. A real diagnostic uses customer-supplied volumes, sample periods and time measurements; estimates remain labelled as estimates.

4. Ranked improvement options

1 · Standardize intake

Use a short required-field checklist and a single owner for each request. This is usually the lowest-risk first change and may not require AI.

Effort: Low · Confidence: To validate · Risk: Low

2 · Draft a structured brief

Convert approved request details into a consistent project brief and missing-information list. A person verifies scope, estimates and commitments before use.

Effort: Medium · Confidence: To validate · Risk: Medium

3 · Track review and follow-up

Create a task in the team's existing project board when a brief is accepted. Avoid adding a new CRM unless the current tools cannot support the workflow.

Effort: Medium · Confidence: Depends on integration access · Risk: Medium

5. Target-state blueprint

  1. Capture the request and validate required fields.
  2. Classify the request and assign a named process owner.
  3. Create a structured draft brief and a list of missing information.
  4. Require human approval for feasibility, effort, price, contract terms and external communication.
  5. Only after approval, create a task and record the next follow-up date.

Controls: least-privilege integration credentials, minimum necessary data, restricted retention, audit trail, retry limits, manual fallback and a documented rollback. No automated proposal sending or customer commitment.

6. Acceptance tests

7. Decision

Example recommendation: validate intake consistency first, then pilot structured brief drafting in an isolated test environment. Do not automate pricing, contractual commitments or external messages in the first iteration.

Not included in this preview: customer-specific analysis, production integration, security certification, guaranteed savings or an implementation commitment.